Skip to content
Scheduling blower door tests for the coming heating season.
Monday – Friday: 7:30 a.m. – 4:30 p.m.Lead-Safe Certified Firm (RRP) · VT Firm cert. no. 000000VerifyBusiness registration · VT Reg. no. 000000General liability insurance
2 more licenses
  • Lead-Safe Certified Firm (RRP) · VT Firm cert. no. 000000Verify
  • Business registration · VT Reg. no. 000000
  • General liability insurance
(802) 555-0104

Services

Air sealing

Most of a cold house's heat loss is air going through small holes. We find them with the fan running and close them one at a time.

Air sealing comes before insulation because insulation slows heat but does not stop moving air. The report lists each leak with a photo, and the crew works down that list. When the last one is closed we test again.

What's included

  • A blower door test before and after

  • Attic hatch, top plates and chimney chases

  • Rim joists and sill plates

  • Wiring, plumbing and duct penetrations

  • Photos of each seam, before and after

  • Combustion safety check of furnace or boiler and water heater

A stud wall opened in a renovation, with spray foam against the framing and electrical boxes and cable running through it

Cost

What changes the price

  • The house's size and shape

    More floors and more corners mean more seams to find and close.

  • How accessible the leaks are

    An open attic floor is quick. A finished knee wall or a cramped chase takes longer.

  • What the framing is

    Balloon framing, stone foundations and old additions each hide different gaps.

  • What the materials are

    Some seams take foam, some take tape and membrane, some need a patch of rigid board.

  • Combustion appliances

    A chimney or a gas appliance that needs more air changes the plan.

How it goes

This work, in order

  1. 01
    Day one

    Step 1: The test and the leak hunt

    Fan in the door, smoke pencil and thermal camera in hand. Every leak gets a number and a photo.

  2. 02
    The report

    Step 2: The ranked list

    The big leaks first: hatch, chimney chase, rim joist. The list is in the report.

  3. 03
    On site

    Step 3: Sealing

    The crew works from the attic down, then the basement up, with the fan running so they can feel the difference.

  4. 04
    Last day

    Step 4: The second test

    We run the same test the same way. You get both numbers beside each other.

Not included

What this work leaves out

  • Insulation

    It follows air sealing and has its own page and its own line in the estimate.

  • A promise of a number

    We tell you what the test measured. We don't promise how low the second number will be.

  • New ventilation equipment

    If the report calls for it, it is a separate line; see the heat pumps and ventilation page.

Before the work

Permits and rules

In an existing home, air sealing alone rarely needs a permit. A new vent, a changed chimney or any new wiring or gas work can. We ask your town's building official when the report says one is involved, and tell you the answer.

Houses built before 1978 may have lead paint on trim, sills and doors. Work that disturbs painted surfaces follows EPA's lead paint rule. See the certificate and insurance page.

Questions about this work

Will my house be too tight?

A house can be too tight for its ventilation. We measure first, check your combustion appliances before and after, and the report says what fresh air the house needs.

Can I do some of this myself?

Some of it, yes: weatherstripping a door, foaming a small gap. The report marks which lines a handy owner can do and which need a crew.

Do you air seal and insulate in the same visit?

Often. We seal first, then insulate, and we test between if you ask.

How long does it take?

A small attic and basement can be a few days. A large old house takes longer. The estimate gives a window.

Start with the test

Book a blower door test and we'll find the leaks first.